Categories
Categories
- Home
- AR PRESSURE WASHER PUMPS / VACUUM / AIR PUMPS
- Truck Mount Extractor Baron Buster I Auto Pump Out System 12 Volts DC (Completely Assembled) 5 GPM
Truck Mount Extractor Baron Buster I Auto Pump Out System 12 Volts DC (Completely Assembled) 5 GPM
Truck Mount Extractor Baron Buster I Auto Pump Out System 12 Volts DC (Completely Assembled) 5 GPM
Product Description
Blue Baron's Truck Mount Auto Pump Out System 12 Volts operated. EASY Hook up Instructions.
** (NEW) ** Easy 2 Wire Configuration Hook Up. Illustrated on the last Video.
The Macerator & Waste Water Discharge Pump Assembly With 12 V Relay, 300 GPH /1,136 LPH Flow Rate
(This is a Fast Discharge Pump, Runs dry without damage, Easy to use and is Self Priming)
'The Baron Buster I' will Bust up the Debris and set your Pump 'Free', and Eliminate time consuming Inline Filter Cleaning and maintenance.
Includes: Easy Installation Instructions
(1) Blue Baron Discharge Pump
(1) Prochem Float Switch with Wiring Harness
(1) 6 Ft of Hard Wall Connection Hose for Inlet and Outlet (Includes Clamps)
ALL STAINLESS PIPE FITTINGS (NO GALVANIZED)
(1) SS Tank Outlet Bushing
(2) 1 1/2 X 6 SS Pipe Nipples
(2) 1 1/2 SS Threaded Street 90 Elbows
(1) 1 1/2 PVC Ball Valve with (2) Floor Clamps
(2) 1 1/2 PVC Barb Adapters
T-Series Discharge and Macerator Pump Runs dry without harm – for Holding Tank System Unlike impeller macerator pumps, our unique bellows pump can run dry without damage. Draws only 6 amps at 12-volt DC. Self-priming up to ten feet (3.3 meters) of water. Handles up to 300 gallons (1,136 litres) per hour. BELLOWS PUMP 38mm (1½”) 12 and 24 Volt For Truck Mount Carpet Cleaning Machines High Volume (Flood Water Recovery).
Good soft solids handling capability. Performance in solids handling equals 38mm diaphragm pump with improved reliability. Longer action provided by Bellows induces greater fluid movement per stroke. Reduced valve movement equals reduced valve failure. Horizontal pumping, by duckbill inlet anad outlet valves, for convenient and low profile installation.
Pump Kit Includes: Pump Assembly Mounted on a 1/2 inch Thick Atractive Poly Board Base with Stainless Mounting Brackets
As well as:
- 12 volt DC operation / Easy Connect Terminal Block For Sturdy Connection
- Patented bellows-style “T pump” can run dry without damage
- Self-priming up to 10 feet of water
- Handles up to 300 gallons per hour flow rate
- Low 6 amp DC draw
- 1.5 in. inlet and discharge outlet
- 10 amp fuse size
- 13 3/4 in. long x 6 3/4 in. wide x 7 3/4 in. tall
- 7 lbs
Addition Items Included Below:
Sturdy Pump Housing
Check Valve / Filter
High Quality Prochem Float Switch
Hoses and Fittings
Shut-Off Valve
Waste Pump Instructions
1. Assemble and install the elbows and nipple into the lower
waste tank fitting as necessary for the particular
application. You may not need to use all of the fittings if
the installation varies (see picture 1). Use thread
sealant or Teflon tape on all fittings.
2. Install the brass check valve with the arrow directed
towards the pump and away from the waste tank.
Tighten the 1 1/2 barb with the 1 1/4 MPT into the check
valve.
3. Apply thread sealant or Teflon tape to the threads of the
float switch and screw it into the upper fitting of the
waste tank. Pay particular attention when starting the
threads as to avoid cross threading the switch. Note the
arrow on the side of the float switch housing and tighten
so the arrow is pointing vertically upward
(see picture 2).
4. Determine the desired location for the pump and cut
hose to proper length. Install the hose to the check valve
and pump and secure the hose clamps. Then mount
pump securely using 4 screws and washers.
5. Tighten the 2 remaining 1 1/2 barb with 1 MPT into the
shutoff valve. Determine the desired location for the
shutoff valve and cut the hose to the proper length
(see picture 3). Install the hose and secure with hose
clamps.
6. To secure the shutoff valve, first install the PVC clamps
over the shutoff valve but do not lock into place. Mark
the location of the mounting holes then remove the
clamps from the shutoff valve. Mount the clamps to the
marked holes using the screws. Put the valve back into
the clamps and lock into position.
7. Mount the toggle switch into the panel and connect one
terminal to the battery post of the engine using the fuse
holder.
Waste Pump Instructions
8. Connect the white wire from the 16-2 cable to
the other terminal of the toggle switch, and
connect the black wire to engine ground.
9. Run the 16-2 cable along the frame to the
pump. Connect the Black wire from the 16-2
cable to the black wire on the pump. Connect
the white wire from the 16-2 cable to the
white wire on the float switch then connect the
black wire from the float switch to the red
wire on the pump (see picture 4).
10. To operate the pump, first connect one end of
a vacuum hose to the barb on the shut off v
alve. Run the other end of the vacuum hose to
an approved disposal site. USE ONLY 1 1/2 OR
LARGER HOSE.
11. Open the shutoff valve then turn on the pump
switch.
CAUTION: DO NOT TURN ON THE PUMP
SWITCH WITH OUT FIRST OPENING THE
SHUT OFF VALVE BECAUSE PUMP DAMAGE
MAY OCCUR.
The pump will operate automatically as the
waste tank fills.
12. When finished with the job, turn the pump out
switch off then close the shut off valve.
Can be installed on the following truck mounts with just a few changes: